# The change process (DTAP)

Your data warehouse never stands still: sources are added, tables change, you build new views. Yres lets
you make those changes **safely** — you test everything first in a separate environment and only promote
to production what is correct. This page describes that process **from your perspective as a customer**:
what you do yourself, and what Yres handles automatically for you.

> For the screens and buttons, see [Projects & Changes](https://yres.eu/en/wiki/frontend/projecten-changes). For the
> technology underneath (DACPAC, ADF publish, Azure DevOps), see [CI/CD & DTAP](https://yres.eu/en/wiki/architectuur/cicd-dtap).

## The idea: dev → test → prod

Yres sets up your environment using the **DTAP model**: separate environments that each have their own role.

| Environment | What for | Who works here |
|---|---|---|
| **Development (dev)** | Where you build and change. The first environment is always dev. | You / your data team |
| **Test (test)** | Where you verify a change is correct before production. | You / acceptance |
| **Production (prod)** | The stable environment your reports run on. | Nobody edits here directly |

The principle: **you only build in dev and you never edit production directly.** A change travels as a
single package, in a controlled way, from dev → test → prod, so your environments stay in sync and no
half-finished work ever ends up in production.

:::note One environment? Then there is no transport
If you have only **one environment**, this whole process is invisible: there is nothing to promote. Your
changes are applied directly and the *Projects* section does not appear. The rest of this page is about
organizations with **multiple** environments. See the [license tiers](https://yres.eu/en/wiki/referentie/licentie-limieten)
for who gets how many environments.
:::

## The two units: Project and Change

You bundle all your work into two units, so it travels as a whole and stays traceable:

- A **Project** is a container with a name, description and due date — for example *"AFAS expansion Q3"*.
- A **Change** is the unit you actually release and promote. Every edit you make in dev — connecting a
  source, adding tables, persisting a view, adding a scripted object via Database objects — is
  **automatically booked under a Change**. A Change always belongs to a Project.

So you don't have to track manually what changed: Yres collects it in the Change, and that Change is your
transport unit to test and prod.

## A change's journey — step by step

```
   DEV                         TEST                        PROD
 ┌───────────┐   release    ┌───────────┐   install      ┌───────────┐
 │  build    │ ───────────▶ │ validate  │ ─────────────▶ │  live     │
 │  (Change) │   (locked)   │           │                │           │
 └───────────┘              └───────────┘                └───────────┘
      1–3            4            5                6
```

You run this whole journey **from the changes table**: on the **Changes** screen (the *Projects* section →
**Changes** sub-link) each change has a row showing, among other things, a **Status overview** (a progress
indicator per environment — green when that step is done, grey when it still has to happen), a **NextStep**
(the suggested next action, e.g. *"Release on dev"* or *"Install on prd"*) and an **Actions** menu (☰) on
the far right. You release, import and install everything from that **☰ menu** — the actions you get are
**contextual to the status** of the change. So you don't go to separate release or install screens.

1. **Plan your work — create a Project.** Give it a name, description and due date. You collect your
   changes under this project.
2. **Build in dev.** Connect sources, add tables, create persisted views, and add scripted objects via the
   **Database objects** (the object tree under Data Engineering). Everything you do is recorded under your
   **Change**. You load and test freely here — this does not touch test or prod.
3. **Review and check the Change.** You see its content as a **diagram** (source → schema → table) or as
   a **table** (per object the load type, the delta column, and what happens if the object already
   exists). That way you know exactly what will travel.
4. **Release the Change.** Open the change's **Actions** menu (☰) and, under **dev ▸**, choose **release
   change**. This **locks** the change: nothing can be edited anymore and it becomes a sealed, promotable
   package. Yres first checks the **dependencies** — if your change contains something that relies on
   another, not-yet-released change, Yres blocks the release and names that other change(s). This way you
   never accidentally take half-finished work along.
5. **Promote to test and validate.** Open the **Actions** menu (☰) again, choose the target environment's
   submenu — **test ▸** — and click **Reinstall change**. Yres brings your change to test and you verify
   there that the loads and structures are correct.
6. **Promote to production.** Correct in test? Then open the **Actions** menu (☰), choose **prd ▸** and click
   **Reinstall change** again. With that, your change is live — tested and confirmed.

![The opened Actions menu (☰) of a change on the Changes screen, with per-environment submenus (dev ▸, prd ▸): on dev an open change offering release change; on a target environment a released change offering Reimport change and Reinstall change, plus Update, Delete, View dependencies and Logs.](https://yres.eu/en/wiki/img/screens/changes-release-install.png)

*You release and promote a change from that change's Actions menu (☰): on **dev** you pick *release change*,
on a target environment (**test**, **prd**) you pick *Reimport change* or *Reinstall change*. The progress
appears as a notification, because publishing the pipelines continues in the background.*

### Import vs. install

In the target environment's submenu (e.g. **test ▸** or **prd ▸**) of the **Actions** menu (☰), a released
change offers two actions:

- **Reimport change** — brings the change into the **data warehouse** of the target environment only (calls
  `[Change].[spImport]`). The ADF pipelines are **not** refreshed. Useful when you just want to stage the
  DWH structure.
- **Reinstall change** — does the full job: the change in the data warehouse **and** republishing the ADF
  pipelines (calls `[Change].[spInstall]` plus the `publish-datafactory` pipeline), so your new source
  pipelines land in the target environment too. This is the step that brings DWH and ADF in sync.

In most cases you choose **Reinstall change**. Through the same actions in the ☰ menu you can reimport or
reinstall a change again later.

## What Yres handles automatically for you

The nice part: at steps 5 and 6 you don't have to do anything technical yourself. Behind a single action in
the ☰ menu Yres handles:

- **Rolling out the database structure** in the target environment (new/changed tables, views, procedures).
- **Republishing the ADF pipelines** so your source loads work in the target environment.
- **Translating names** between environments. A source called `ERP_DEV.Product` in dev becomes
  `ERP_TST.Product` in test and `ERP.Product` in prod — Yres automatically adapts the change to the right
  physical objects per environment (the *change deployment rules*).
- **Guarding versions** (see below).

> Under the hood this runs `[Change].[spRelease]`, `[Change].[spImport]` and `[Change].[spInstall]`, plus
> the Azure DevOps pipeline `publish-datafactory`. The full technology is in
> [CI/CD & DTAP](https://yres.eu/en/wiki/architectuur/cicd-dtap).

## The guardrails — why this is safe

Yres builds in a number of checks so you can't break production:

- **Versions must match.** Before an install, Yres checks that the **DWH versions** of the source and
  target environment are equal. If not, you get *"Environment versions do not match, please update"* and
  nothing is installed — first update the lagging environment via
  [Update environments](https://yres.eu/en/wiki/frontend/admin).
- **Dependencies are checked** when releasing: you cannot release a change that relies on work that has
  not yet been released.
- **A released change is locked** — nobody can quietly change anything after release.
- **You cannot delete a project** while it still contains open changes, and a change's due date must be on
  or before that of the project.
- **Nothing goes to prod untested**, because you always promote via test first.
- **Your history is preserved.** The load engine versions your data (SCD2), so a structural change does
  not throw away existing history. See [History & SCD2](https://yres.eu/en/wiki/concepten/historie-scd2).

If something does go wrong, you can roll back a load or change — see [Rollback & reset](https://yres.eu/en/wiki/concepten/rollback-reset).

## A real-world example

*Illustrative — a typical course of events, not a specific customer.*

Acme wants to unlock their AFAS administration:

1. A data engineer creates the project **"AFAS connection"** with a due date.
2. In **dev** she connects the AFAS source, refreshes the metadata and adds the desired tables — all
   booked under the change **"AFAS tables v1"**.
3. She runs the first loads in dev and checks the data.
4. She **reviews the change content** (is the load type per table correct?), opens the **Actions** menu (☰)
   and, under **dev ▸**, chooses **release change**.
5. She opens the ☰ menu again, chooses **test ▸ Reinstall change**, runs the loads in test and has a
   colleague validate the reporting.
6. Approved? Then in the ☰ menu she chooses **prd ▸ Reinstall change** for the same change. The AFAS data is
   live, and dev, test and prod are in sync again.

For a **new source of an existing type** (as above) there is usually **no** code change needed — these are
metadata rows that the install flow promotes neatly between your environments.

## Further reading

- [Projects & Changes](https://yres.eu/en/wiki/frontend/projecten-changes) — the screens, buttons and fields
- [CI/CD & DTAP](https://yres.eu/en/wiki/architectuur/cicd-dtap) — the technology: DACPAC, `adf_publish`, Azure DevOps
- [Rollback & reset](https://yres.eu/en/wiki/concepten/rollback-reset) — roll back a change or load
- [Data flow](https://yres.eu/en/wiki/concepten/gegevensstroom) and [History & SCD2](https://yres.eu/en/wiki/concepten/historie-scd2) — what a load does to your data